| SCE Wind Load Rating – SCE Territory | |
|---|---|
| Submitted by SCE 08/15/2017 |
| Utility Requirements for Allowable Pole Loading | |
|---|---|
|
|
Per Admin Board May 2018 |
| 1/28/2016 | |
|
Pole Loading and Anchor: |
4/17/2013 |
|
Pole Replacement Guides – 2013: |
2013 |
|
VZ, AT&T Guide – 03/2014 : |
03/2014 |
| Pole Loading Information from City of Los Angeles | |
|---|---|
| Submitted by LADWP 01/26/2016 | |
| Submitted by LADWP 01/26/2016 | |
|
|
Submitted by LADWP 02/15/2012 |
| Submitted by LADWP 03/12/2012 | |
| Submitted by LADWP 02/20/2013 |
| Technical Resources from AT&T CA | |
|---|---|
|
|
Submitted by AT&T CA 12/24/2025 |
ProposedWindRatings_Public_CountyCity_20151216.pdf
DWP Master Catalog for O-Calc Pro.zip
Cable-Strand-Info_2023.pdf (293.99 KB)